|
·Your current location:Questions |
When should I have my product tested? |
Writer:LANDER TESTING View:4586 Addtime:2007-8-29 |
Product testing should be performed during the design stage or before the production occurs. In order to create a better communication and control on suppliers, it is advised to include the request of documentation such as test report, testing certificate and inspection certificate in the sales contract and the letter of credit. |
Online advice |
|